Deck replacement
Review the existing structure, connections, stairs, rails and material options before deciding what can stay.
Call
Start a projectContact
Western North Carolina sites can make outdoor work more technical than it first appears. WNC Built reviews grade, access, structure, drainage, utilities, material exposure and how the new work connects to the house.
Updated
It depends on what matters more to you. As of July 2026, WNC Built plans with $13,000 to $20,000 for a standard wood deck and $18,000 to $28,000 for composite. Choose composite if you want less routine surface maintenance. Choose wood if upfront cost and a natural look matter more. Steep slopes, difficult footings, roofs and larger structures need their own scope either way.

Scope
Review the existing structure, connections, stairs, rails and material options before deciding what can stay.
Coordinate footings, structure, access, entries, guardrails, lighting and the relationship to the house.
Add a covered or screened space, built-ins, cooking components and utilities where the site and code allow.
The July 2026 planning model uses $13,000 to $20,000 for a standardized wood-deck scope and $18,000 to $28,000 for a standardized composite-deck scope. Larger or covered structures need a separate scope.
This is a planning range, not a quote. A project-specific scope, site review, selections, drawings and current trade pricing are required before construction pricing is firm.
Common questions
Usually yes. A deck is structural, so the City of Asheville, Buncombe County and Henderson County generally require a building permit and inspections. The exact path depends on the address, the deck height and how it attaches to the house, so WNC Built confirms it with the jurisdiction during planning.
Usually the structure and the site, not the boards. Footings, framing, tall posts on a slope, stairs and railings drive cost in the mountains. Composite boards also cost more up front than wood, which is why the July 2026 planning ranges are $13,000 to $20,000 for wood and $18,000 to $28,000 for composite.
Steep slopes, limited delivery routes, staging limits and difficult footings can add labor, equipment and engineering needs.
No. Composite usually reduces routine surface maintenance, while wood has a different cost and appearance. Structure, heat, exposure, detailing and owner preference all matter.
No. The estimator uses standardized wood and composite deck benchmarks. Roofs, screens, kitchens, major utilities and difficult sites require a broader range.
Start a project
Share the property location, what you want to change and anything you already know about the scope. Brad and the team will follow up to talk through fit, timing and next steps.